Utility

live wire const logo 3d 2018trans.png

Underground

 

LiveWire crews perform excavation and repairs to underground secondary cables involved with the AMI Smart Meter Program for ComEd. These repairs include the pulling, installing, and splicing of the cable that runs from the residential or commercial meter, to the pedestal or pad mount transformer.

download (1).jfif